Assalammualaikum ..Good Morning world and My Green Buddies...
This is our
third day as planter’s even we had spent time together to finish all the given
task but the spirit as planter’s still stronger in ourselve.Still same as
usually,we must wake up early in the morning and prepare ourselve to
gather in group at 6.30 a.m and make the usual routine.Still be the same,sings
the song,do some exercise to cheer ourselve and make the day is our best day
.Last week,we take the longer time to finish our clearing process,the time
taken to finish all the clearing process is about 9 hours and 15 minutes.In
this third week,our task is making the lining with the given area that we had
been clearing,we must make the lining to make about 60 beds with length and
width ( 12 x 4 ) square fit and all the total of beds for the whole area with
length and width is about ( 65 x 80 ) square fit.The task given for us
needed one beds each person but we still needed to prepare another beds for our
future preparation .In this lining process we just have to use rope. We also
must make the long narrow trench for drainage or as boundary surround the
area of the beds.So,we had been divided to do our duty, some of them do the
lining and some of the others make the drainage.
About Beds
Measurement :
- 65 x 80 fts (whole area )
- 4 x 12 fts (each beds )
- 3 fts for agro road (vertical
& horizontal )
- 2 fts from drains
- 1 fts from others beds
 |
| Focus on work |
 |
| lots of sweat while hoeing |
 |
| Still fighting to finish it.. |
|
|
|
|
|
|
 |
| Man always be the strongers,being teamwork to makesure all can be done in the short time |
 |
| Lining Process |
 |
| More Lining will come out |
Tiada ulasan:
Catat Ulasan